Document intelligence

Every baseline document is ingested, OCR'd, structured and confidence-scored before it can support a valuation. Low-confidence pages route to a human.

Documents ingested

8

Across the Al Noor baseline set

Pages parsed

2,087

Text, tables and drawing annotations

Awaiting human review

2

Confidence below 70% threshold

Mean OCR confidence

72%

Scanned paper drags the average down

DocumentCategoryPagesStateConfidence

Contract Agreement — Al Noor Residences.pdf

DOC-001 · 8.4 MB · uploaded 2024-03-04

Contract agreement214ApprovedHigh · 97%

Project Specifications Vol I-III.pdf

DOC-002 · 42.1 MB · uploaded 2024-03-04

Project specifications1180ApprovedHigh · 94%

Architectural & Structural Drawings.zip

DOC-003 · 310 MB · uploaded 2024-03-06

Project drawings486StructuredHigh · 91%

Bill of Quantities — priced.xlsx

DOC-004 · 3.2 MB · uploaded 2024-03-06

Bill of Quantities62ApprovedHigh · 96%

IPA-017 Contractor Application.pdf

DOC-005 · 6.8 MB · uploaded 2026-07-14

Payment application88StructuredHigh · 90%

RFA-0431 Floor 7 Plaster.pdf

DOC-006 · 1.1 MB · uploaded 2026-07-13

RFA4Needs ReviewLow · 62%

Scanned site measurement sheets (paper).tif

DOC-007 · 22.7 MB · uploaded 2026-07-19

Measurement34ProcessingLow · 48%

Facade delivery notes — July.pdf

DOC-008 · 2.4 MB · uploaded 2026-07-20

Delivery note19Uploaded

Baseline document intake

Four governing inputs obtained from the bank. Drag and drop PDF, Excel, image or scanned paper documents.

3 of 4 approved
  1. 1Approved

    Contract agreement

    Signed agreement, particular conditions, appendices

  2. 2Approved

    Project specifications

    Technical specification volumes I–III

  3. 3Structured

    Project drawings

    Architectural, structural and MEP drawing sets

  4. 4Approved

    Bill of Quantities

    Priced BOQ workbook, re-measured schedules

Side-by-side extracted data review — Contract agreement

Source document preview

Simulated viewer — highlighted regions correspond to the extracted fields listed alongside.

Document quality: Excellent (native PDF)

FieldExtracted valueSourceConf.
Contract valueAED 186,500,000p.14 cl. 2.198%
Form of contractFIDIC Red Book 1999 (as amended)p.3 preamble95%
Retention10% capped at 5% of contract sump.61 cl. 14.393%
Defect Liability Period12 months from taking-overp.72 cl. 11.191%
Advance payment10%, recovered pro-rata from IPC-004p.58 cl. 14.288%
AI-assisted — Professional Engineer approval required. Figures are model-generated from submitted evidence and are not certified until an engineer signs off.