Settings & demo controls

This is a clickable prototype. All data is fictional, stored locally in your browser and reset at any time.

Guided demo walkthrough

A ten-step end-to-end tour of the IPC and smart-helmet journey. Each step confirms completion automatically once the matching action is written to the audit trail.

0 of 10 steps completed

  1. 1 · Baseline document intakeContract, BOQ, drawings and the payment application are ingested and OCR-scored.
  2. 2 · BOQ to SMM7 mappingAmbiguous BOQ descriptions are mapped to SMM7 work sections and confirmed by a human.
  3. 3 · AI pre-inspection planThe claim, RFAs and drawings generate a prioritised list of checks before anyone travels.
  4. 4 · Sync plan to smart helmetChecks are pushed to the helmet so the inspector is guided hands-free on site.
  5. 5 · Helmet capture & voice noteLive feed, voice notes and sensor telemetry capture evidence and raise defects automatically.
  6. 6 · Defect ticket triageSnags become tracked tickets with SLA, owner and evidence.
  7. 7 · Review AI findingsEach AI claim is checked against its evidence chain; the engineer accepts, adjusts or rejects.
  8. 8 · IPC recommendationThe certificate is recommended in full or in part with a mandatory audited comment.
  9. 9 · Bank letter & PDF exportThe recommendation letter with conditions, exclusions and sign-off is exported and emailed.
  10. 10 · Bank escrow releaseThe lender releases only the independently verified net amount.

Personas

Each persona sees a different navigation set and a different set of permitted actions. Switching persona never changes the underlying evidence.

Integrations (simulated)

  • Disbursement postings and facility balances

  • Video, audio, GPS and sensor telemetry

  • Contracts, drawings, BOQ and RFAs

  • Baseline vs actual progress

  • Compliance extracts and stalled-project notices

Language & site communication

Voice notes captured on site are transcribed and translated for the crew. English, Arabic (RTL), Hindi/Urdu and Chinese are supported in the helmet workflow.

Englishالعربيةहिन्दी / اردو中文

Data segregation & assurance

  • Each bank, developer and authority is a separate tenant; project data is never shared across tenants.
  • The audit trail is append-only — 8 events recorded in this session.
  • AI outputs are advisory. Certification remains with the appointed engineer at all times.
  • Worker physiological data is surfaced only as safety alerts to authorised supervisors.

Session audit trail

Search and filter every event recorded in this demo session — AI findings, engineer decisions, tickets and draw approvals.

Showing 8 of 8 events.

  1. 2026-07-14 09:12 · 0x9f2c…41ab

    IPA-017 submittedGulf Horizon Contracting LLC Contractor

    Gross claim AED 8,450,000 with 88 pages of supporting evidence

  2. 2026-07-14 15:40 · 0x71de…9c02

    Consultant verificationMeridian Engineering Consultants Consultant

    Recommended AED 8,310,000; noted RFA-0431 outstanding

  3. 2026-07-15 08:05 · 0x2ab8…77f1

    Developer acknowledgementAl Noor Properties LLC Developer

    Forwarded to Emirates Development Bank escrow desk

  4. 2026-07-15 10:22 · 0x54c1…0dd7

    Draw request raisedEmirates Development Bank Bank

    Third-party inspection instructed under facility clause 8.3

  5. 2026-07-16 07:48 · 0xbb07…52e9

    Document review completeBuildSure AI Engine v4.2.1 AI

    214 line items parsed, 6 exceptions raised, supported value AED 7,820,000

  6. 2026-07-16 12:10 · 0x3ef4…a108

    Pre-inspection plan generatedBuildSure AI Engine v4.2.1 AI

    7 prioritised checks, route optimised, assigned to Eng. Rashid Al Mansoori

  7. 2026-07-18 07:31 · 0x8c19…be44

    Site inspection executedEng. Rashid Al Mansoori Inspector

    Helmet HLM-04, 38 photographs, 12 voice notes, 2 defects raised

  8. 2026-07-21 08:05 · 0xd402…31cc

    Engineer review openedEng. Rashid Al Mansoori Inspector

    Adjustment under assessment on plaster and facade packages

AI-assisted — Professional Engineer approval required. Figures are model-generated from submitted evidence and are not certified until an engineer signs off.